A reminder that the use of any generators that has a services rated more than 500 KVA will require an electrical permit, whether filming is done in studio, on location including City streets, sidewalks, and plazas. For more information about Electrical Permits, please click on this link.
Once your application has been approved and electrical permit is issued, you are able to begin your work. However, all work must be inspected to have your permit finalized. Inspections ensure that construction and trades work:
Matches the work described under the permit
Complies with relevant bylaws
Meets safety, accessibility, and green building goals
Since production reliance on generated power is so high, requests for electrical inspections are a critical and an important step to take to ensure that your shoot day is smooth with zero risk of delay or being shut down.
There are multiple ways to book or cancel an electrical inspection; including:
On-line if you have an existing online account and are the permit applicant or contractor
Contact 3-1-1 (outside Vancouver 604-873-7000)
Information about inspections, fees, and contact information can be found on this link.